Step 1: Filling

Description

Befüllung

  • Insert plunger
  • Fill product into drum

 

 

 


Step 2: Storage

Description

Lagerung

  • Storage
  • Transportation to filling line

 

 

 


Step 3: Preperation

Description

Vorbereitung

  • Use pallet truck to move drum into drum-emptying stand
  • Lower the cover with the handwheel

 

 

 


Step 4: Emptying

Description

Entleeren

  • Drum emptying through the product piping to the filling line

 

 

 


Step 5: Ready for a new load

Description

Ende und Neubeginn

  • The drum is 100 % empty
  • It is easy to clean
  • The drum can then be filled again

 

 

 


Current events

  • 2010-10-31 - 2010-11-04

    PACK EXPO CHIGAGO

    McCormick Place Upper East Hall (Lakeside) Booth E-6555 Chicago, IL, USA

  • 2010-11-22 - 2010-11-25

    SALON D'EMBALLAGE

    Paris-Nord, Villepinte Paris, France

Current jobs

  • Sorry - No vacancies at the moment