OEB Level 1+2

Standard version

Description

Standardlösung

  • Simple docking
  • Accurate positioning not necessary
  • Key to sketch:
  • A - product
  • B - into machine
  • C - silicone elastomer cap
  • D - system inlet tube / cone
  • E - lip seal

 

 


Version with hopper pressed against lip seal

Description

Lösung mit angepasster Dichtlippe

  • Simple docking if system becomes slightly pressurized
  • Key to sketch:
  • A - product
  • B - into machine
  • C - silicone elastomer cap
  • D - system inlet tube / cone
  • E - lip seal pressed down

 

 


Telescopic version

Description

Lösung mit Teleskopbindung

  • Simple docking with telescopic intermediate tube
  • Key to sketch:
  • A - product
  • B - into machine
  • C - silicone elastomer cap
  • D - system inlet tube / cone
  • E - lip seal
  • F - telescopic intermediate tube

 

 


Charging a reactor

Description

Beschickung

  • Key to sketch:
  • A - drum
  • B - hopper
  • C - inlet elbow
  • D - lift / swivel / invert column
  • E - lip seal pressed down

 

 


Feeding a tablet press

Description


  • Key to sketch:
  • A - drum
  • B - hopper
  • C - nest
  • D - supporting column
  • E - lip seal
  • F - tablet press
  • G - mobile lifting and inverting unit
  • H - variant with dust extraction connection

 

 


Charging / discharging a twin-shell tumbler

Description

Beschickung eines V-Mischers

  • Key to sketch:
  • A - drum
  • B - hopper
  • C - inlet elbow
  • D - lift / swivel / invert column
  • E - lip seal
  • F - twin-shell tumbler
  • G - drum truck
  • H - centering guide
  • J - Type MC butterfly valve
  • K - drum lid with filling opening:
    • K1 - Filling drum:
      lid placed over drum
    • K2 - Removing drum:
      lid retracted on discharge nozzle

 

 


Charging / discharging a mill

Description

Beschickung / Entleerung einer Mühle

  • Key to sketch:
  • A - drum
  • B - hopper
  • C - nest
  • D - supporting column
  • E - telescopic intermediate tube
  • F - mill
  • G - drum truck
  • H - drum lid with filling opening:
    • H1 - Filling drum:
      lid placed over drum
    • H2 - Removing drum:
      lid retracted on discharge nozzle
  • J - Nest swivels aside

 

 


Charging through a floor

Description

Beschickung durch die Decke

  • Key to sketch:
  • A - hopper bin
  • B - carriage
  • C - Type MC butterfly valve
  • D - distribution manifold
  • E - Charging sequence:
    • Step 1
      Move hopper bin over charging opening
    • Step 2
      Docking with telescopic intermediate tube
    • Step 3
      Telescopic intermediate tube retracted
    • Step 4
      Opening covered

 

 


Current events

  • 2012-05-23 - 2012-05-24

    SCHÜTTGUT Basel

    Messe Basel Halle E Basel, Schweiz The following companies of the Müller Group take part in this exhibition: ...

  • 2012-05-22 - 2012-05-25

    KOREA PACK

    Kintex-Korea International Exhibition CenterSeoul, Republic of Korea   The following companies of the ...

Current jobs

  • Sorry - No vacancies at the moment